Selected Work

Built to perform. Built to last.

The Meridian Center
Commercial · 2023 · Portland, OR

The Meridian Center

45,000 sq ft mixed-use facility utilizing sustainable thermal mass and raw concrete finishes. Delivered three weeks ahead of contract schedule.

Vista Ridge Estate
Residential · 2024 · Bend, OR

Vista Ridge Estate

High-elevation luxury residence featuring cantilevering decks and specialized site foundation engineered for variable bedrock.

Iron Works Hub
Industrial · 2022 · Tacoma, WA

Iron Works Hub

Adaptive reuse of a 1940s steel plant into a 60,000 sq ft logistics and light-manufacturing facility.